
Repainting Between Tenants: A Guide for Property Managers
Every day a unit sits empty is a day without rent. For property managers, the gap between one tenant moving out and the next moving in is tight, and painting is often the biggest job in that window.
Done well, turnover painting is fast, predictable and consistent from one unit to the next. Here's how to plan it, whether you manage one multi-unit building, a commercial plaza or a whole portfolio.
Why repainting between tenants pays off
- Units show better. Fresh, clean walls photograph well and make a strong first impression at viewings.
- Small problems get fixed. Patching nail holes, scuffs and minor drywall damage keeps wear from building up over years.
- It sets the standard. New tenants who move into a well-kept space tend to treat it that way.
- It's easier with the space empty. No furniture to move and no one to work around means the job goes faster.
Plan the turnover
The fastest turnovers are planned before the old tenant leaves:
- Book the painter when notice is given. Most tenants give advance notice, so there's time to get on a painter's schedule before move-out day.
- Inspect right after move-out. Walk the unit to decide whether it needs a full repaint or just touch-ups, patching and a few walls.
- Sequence the trades. Painting usually goes after repairs and before cleaning and new flooring, so other trades don't damage fresh walls.
- Leave time for drying before the unit is cleaned, shown or moved into.
For buildings with regular turnover, a standing arrangement with one painting contractor saves re-explaining the job every time.
Commercial suites: what changes
Turning over an office, retail or industrial suite follows the same idea, with a few extra things to plan for:
- Landlord standard vs. tenant fit-out. Many leases return a suite to a base-building standard: one neutral colour, standard ceilings and doors. Check the lease and agree the scope before work starts, especially if the outgoing tenant painted in brand colours that need extra coats to cover.
- Timing around the incoming tenant's fit-out. If the new tenant is building out the space, base painting may happen before their work and final painting after. Coordinate with their contractor so nothing gets painted twice.
- Occupied buildings. Neighbouring suites stay open, so noise, odour and access to corridors, elevators and loading docks have to be managed. See our guide to painting an occupied commercial building.
- Common areas. A turnover is a good time to refresh the corridor, entrance or storefront the new tenant will see first.
Standardize colours and products
Using the same colours and paint products in every unit is one of the simplest ways to speed up turnovers:
- Touch-ups blend in. When every unit uses the same wall colour and sheen, small repairs don't need a full wall repainted.
- No guesswork. The crew knows exactly what to bring, every time.
- A consistent look across the building, which helps marketing and leasing.
A good standard is one neutral wall colour, one trim and door colour, and a scrubbable eggshell or satin finish that holds up to wear and cleaning. Keep a written spec sheet with the product names and colour codes so anyone can match them later.
Turnover painting checklist
- Painter booked as soon as notice is received
- Move-out inspection done; scope decided (full repaint or touch-ups)
- For commercial suites: lease return standard and fit-out schedule confirmed
- Repairs finished before painting starts
- Colour and product spec sheet shared with the painter
- Access arranged: keys, lockbox or on-site contact
- Walls, ceilings, trim and doors checked after painting
- Leftover paint labelled and stored for future touch-ups
- Unit ready for cleaning and showings
Keep your units turning over
City Painters Group has been painting across Southern Ontario since 2001, working directly for property managers and facility teams. If you manage multi-unit buildings, condos or commercial properties, we can help you set up a turnover painting process that keeps vacancies short. Before you hire, here is what to ask a commercial painting contractor.
Call (519) 617-2072 or email info@citypaintersgroup.ca to talk about your properties, or request a quote online.

